Low Rise Platform Lift (electric)
SCOPE:
- To construct a concrete pad to take a low-rise platform lift and timber platform to provide access from the lift into the dwelling.
PRELIMINARY AND GENERAL
- The Housing Modification Schedules shall be read in conjunction with sketches/drawings and summary sheet provided by the Specialised Housing Assessor and the Agreement for Contractor Services
- Where a site visit has not been undertaken to ascertain the conditions, levels, boundary positions, access etc, no variations will be given by reason of ignorance of the site or existing site conditions
- The low rise platform lift and access platform is to be located and constructed in the location shown on the proposed sketch plan. Any variations are to be approved by the Specialised Housing Assessor and Enable New Zealand
- A building consent is required for all low-rise platform lifts unless exempted by the Territorial Authority. Written confirmation of exemption is required from the Territorial Authority. The Contractor shall arrange to obtain all necessary consents from the local Territorial Authority
- All work must comply with the relevant conditions of the Building Act and NZ Building Code
- The Contractor shall provide all necessary protection to the client and other person/s from holes, unsafe building, falling and other hazards
- Damage resulting from failure to protect adequately will be made good at the Contractor's expense
- The low-rise platform lift and associated work shall be carried out by skilled tradespeople using best trade practice and materials.
CARPENTRY
- Grades of timber are specified in the National Grading Rules. The timber shall be free from shakes, loose knots, and gum streaks. Sub-standard or warped timber shall not be used
- Timber shall be treated to H4 and is to be planner gauged
- Galvanised nails of an appropriate size are to be used to secure the timber.
Construction
- The concrete pad shall be installed in strict accordance with the lift manufacturer's specifications. It is the Contractor's responsibility to ensure they have the relevant information from the lift manufacturer. Concrete strength shall be 17.5 Mpa after 28 days
- Lay a concrete path from the entry to the lift to the nearest path or parking area
- Construct a timber platform from the lift to the nearest door into the house
- The structure of the platform must provide adequate strength and stability for all users. The platform is to be securely fixed to the existing deck
- The platform surface shall be of a non-slip finish without gaps, lips or uneven surface. Nails shall be punched below the ramp surface. The decking shall be 100x40mm pinus radiata tread decking laid at right angles to the direction of travel
- The entry and exit to the platform shall be formed with smooth thresholds avoiding sudden changes in level. The entry to the base of the ramp shall be of suitable material to avoid damage and splitting
- The height of the platform/landing is to align with the existing doorsill to minimise changes in level and an excessive up stand
- Allow to install an approved barrier or gate to the timber deck at the top lift access
- Allow to install or relocate steps as required, if the existing steps are being covered over.
ELECTRICAL
- Supply and install a waterproof power source as specified or recommended by the lift manufacture/supplier.
Note: Any circuit breaker or power outlet is to be mounted in a position accessible to the person
GENERAL
- Windows with opening sashes over landing shall be fitted with restrictors to avoid open sashes projecting over access landing.
- Handrails are to be positioned as recommended by the Specialised Housing Assessor.
- Handrails shall be shaped to provide a profile that is easily grasped by the person. The handrail shall be securely fixed to support posts or building to ensure it does not flex or move
- The handrails must be continuous for the length of landing and all junctions formed are smooth and secure
- The handrail is to be packed off the posts or wall to ensure, under normal use, the persons hand will not contact the post, wall or other obstruction.
COMPLETION
- Clean down all work, test and leave in a tidy condition ready for use.
NOT INCLUDED
Ministry of Health Funding will not cover the following:
- Additional work requested by the property owner and/or client
- Painting of the landing, platform and handrails
- Repairs and Maintenance.
Phone 0800 17 19 81